Faced with the expensive and time consuming prospect of tearing out perfectly good concrete and pouring a new sidewalk, Hillsboro Parks and Recreation Department called Concrete Lifting Solutions. Download the Hillsboro Parks & Recreation Case Study 1.
BEFORE![]() |
AFTER![]() |
|
| THE PROBLEM:
A handicap restroom has a wheelchair access restriction.The door sill is almost 2” above the sidewalk. |
THE SOLUTION:
Grout injection or ‘Slabjacking’. By injecting a grout mixture under pressure beneath the offending concrete slab, the walk is raised, intact, to the necessary level. |
The process was completed in an afternoon and the restroom was accessible the same day, and in full compliance.